Clarification document for the project of renovating the packaging material warehouse in the reserved area on the fourth floor of the formula granule preparation workshop of Hunan Chunguang Jiuhui Modern Chinese Medicine Co., Ltd
Each bidder:
This clarification document is an integral part of the bidding documents and has the same legal effect as the bidding documents. In case of any inconsistency between this clarification document and the bidding documents, this clarification document shall prevail. The specific content is as follows:
2.4 Construction period: Complete the project before May 10, 2024, and pass the acceptance organized by the purchaser. Revised to complete construction before May 18, 2024.
2.5 Project Scope:
|
serial number |
Job responsibilities |
unit |
quantity |
Remarks |
|
four |
Install 380V wires and air switches, install 11 idle air conditioning cabinets with 3 horsepower and 5 horsepower, and modify the wires and other components. |
item |
one |
|
修改为:
|
serial number |
Job responsibilities |
unit |
quantity |
Remarks |
|
four |
Install 380V wires and air switches, install 11 idle air conditioning cabinets with 3 horsepower and 5 horsepower, and connect cables (in addition to adding wires and 2 sockets in the shipping area on the first floor). |
item |
one |
|
The rest remains unchanged.
Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd
April 23, 2024
-
2025-04-15
Bidding announcement for the steam pipeline project of the old extraction and preparation workshop of Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd
-
2025-04-10
Announcement of Candidates for the Winning Bidder of the Chunguang Jiuhui Solid Waste Disposal Project
-
2025-03-31
Announcement on the postponement of the solid waste disposal project of Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd
Back