Bidding for Photovoltaic Power Generation Construction Project of Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd
1、 Bidding conditions
The photovoltaic power generation construction project (project name) of Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd. (purchaser name) is open for bidding, and qualified bidders are now invited to participate in the bidding.
2、 Project Overview and Bidding Scope
Project Name: Photovoltaic Power Generation Construction Project Location: Liuyang Production Base
Project scope: General contracting for investment, installation, commissioning, acceptance, training, and quality assurance services of distributed photovoltaic power generation systems
Construction scale: The roof area is approximately 12000 square meters
Contribution ratio: 100% of the bidding unit
Investment duration requirement: after the contract is signed
Section division: 1 section
3、 Requirements for bidding documents:
① Copy of Business License (stamped)
② Authorization letter from legal representative, ID card (copy) stamped
③ Provide and stamp the following documents: (investment scale, investment calculation, analysis of operating income calculation, project cooperation mode plan, total installed capacity of photovoltaic power, energy saving and consumption reduction analysis table, power generation forecast analysis table, annual average power generation analysis table, operation period, deduction of photovoltaic power unit price, and proportion of carbon emission rights granted to the owner).
4、 Credit requirements
(1) The bidder is not in a state of revocation of business license, order to close down or revocation, or in a state of being ordered to suspend business, property taken over, frozen, bankrupt, etc.
5、 Performance experience requirements
(1) The bidder shall have 5 years or more of experience in investment and operation management of photovoltaic projects, and have invested in the construction and operation of approximately 1.4MW distributed rooftop photovoltaic power generation projects nationwide (5 project contract attachments)
(2) Bidders must be the project investment entity or the holding company of the investment entity for project investment and construction, as well as the entire operation cycle of the project. They cannot subcontract to third parties and must provide relevant qualification certification documents.
6、 Quality requirements
(1) Strictly follow industry standards, the lifespan of the entire system and components shall not be less than 25 years, and the attenuation rate shall not exceed 20% by the 25th year;
(2) Ensure the electricity efficiency and continuous stability of enterprises in the park, with fast and efficient operation and maintenance, and no major electricity accidents
7、 Review method
The evaluation method for this project adopts competitive negotiation
8、 Submission of bidding documents:
(1) The deadline for submission of bidding documents and the bid opening time are 9:30 am on May 30, 2023, at Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd. (Liuyang Biomedical Park)
(2) Bids that are delivered late, not delivered to the designated location, or not sealed and marked as required will not be accepted by the tenderer.
9、 Media for publishing announcements
Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd( http://www.hncgjh.com/ )Publish it online.
10、 Contact Information
Bidder: Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd
Contact: Mr. Zhu Phone: 15874044952
-
2025-04-15
Bidding announcement for the steam pipeline project of the old extraction and preparation workshop of Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd
-
2025-04-10
Announcement of Candidates for the Winning Bidder of the Chunguang Jiuhui Solid Waste Disposal Project
-
2025-03-31
Announcement on the postponement of the solid waste disposal project of Hunan Chunguang Jiuhui Modern Traditional Chinese Medicine Co., Ltd
Back